Draw on the lot
Rectangles, outlines and a pencil. Buildings, paving and areas, plus paths, swales, grade breaks and fences as lines, each on its own CAD layer.
Click a tax lot for its zoning, slope, soils, public utilities and survey grid. Export lidar contours to AutoCAD or Civil 3D. Draw the site with a building pad, cut and fill and setbacks, and hand it off as a layered DXF and a PDF sheet.
Standard is $99 a month for all of Oregon; Pro adds site concepts at $199 with two seats. Extra seats $49. No card needed for the trial.
Type an address or click the map. The county's tax-lot outline, the assessor details and the zoning come up on one card.
Slope across the whole parcel in five bands, hillside checks, soils, and the nearest public mains and power lines.
Open the lot as a site plan. Place the building and paving, set a pad elevation, and see cut and fill, the daylight line and a section.
A layered DXF in State Plane, a two-sheet PDF of the plan, contours as DXF, KML or KMZ, or the parcel report.
Five bands from under 5% to over 40%, with the acres in each, measured from DOGAMI lidar. Hillside checks flag steep ground, mapped landslides, soils and flood. A check whose source did not answer reads Not checked, never Clear.
Pick the parcel or draw a box, choose an interval from 0.5 to 40 ft, and download a DXF in Oregon State Plane, or KML or KMZ.
Map layersOver twenty on the map, each with its own opacity: zoning, flood, wetlands, streams, landslides, slope, hillshade, contours, soils, tax lots, the survey grid, water rights and wells, state highways, power lines and utility mains.
Open any lot from the map or from an address and it becomes a full-screen drawing of that lot, with the lidar, the mains and the lines around it already in place.
Rectangles, outlines and a pencil. Buildings, paving and areas, plus paths, swales, grade breaks and fences as lines, each on its own CAD layer.
Set a pad elevation and see cut and fill in cubic yards, the balanced pad, the daylight line and a section profile, estimated from lidar ground.
Front, side and rear setbacks and maximum coverage, with the buildable envelope and its checks. Setbacks as you enter them, or as you confirm them from the code. Neither is a city review.
Upload the city's development code and we read its setbacks, coverage, height, parking and landscaping standards, each with the page and the sentence it came from. Confirm them, describe the project, and get three concept layouts for the lot, each checked against the standards you confirmed. Pick one and it opens in the site plan editor, ready for DXF and PDF.
Adjoining tax lots merge into one site with the old lot lines kept dashed. Lots across a street or alley stay separate pieces.
Contours, utility mains, power lines, the survey grid, wells and state highways drawn around the lot, and carried into the files where their sources allow.
Share a plan with everyone on the team or with chosen people, to view or to edit.
| MARK | DELIVERABLE | FORMAT | CONTENTS | NOTES |
|---|---|---|---|---|
| D1 | Contours | DXF · KML · KMZ | Lidar contours for the parcel or a drawn box at 0.5 to 40 ft, with index and intermediate contours and their labels on their own layers. | Oregon State Plane North or South, international feet. |
| D2 | Parcel report | PDF · 2 sheets | The tax lot over lidar contours with a State Plane title block, then every site check with one state and its source, and the filings on the tax lot. | Not checked is never a green mark. Nothing found means only that the source reported nothing. |
| D3 | Site plan drawing | DXF | Each shape on its own layer, with the lot, the pad, the daylight line, the setback envelope and the contours, plus mains, power lines, the survey grid, highways and wells on theirs. | Utility layers only where the utility's terms allow a download. |
| D4 | Site plan sheets | PDF · 2 sheets | The plan at 1" = 20', 1" = 40' or fit, with the map layers you turned on, then the site checklist for each lot. | Cut and fill estimated from lidar ground. Setbacks as entered. |
AutoCAD R12 ASCII in Oregon State Plane North or South, international feet. Every source sits on its own named layer, so you freeze what you do not need, and a layer is written only when it has something on it.
| LAYER | WHAT IT HOLDS | FROM |
|---|---|---|
| THE GROUND AND THE LOT | ||
| BOUNDARY | The extent of the export | The area you chose |
| PARCEL | The tax-lot outline, labelled with its number | County assessor |
| CONTOUR-INDEX | Every fifth contour | DOGAMI lidar, USGS 3DEP |
| CONTOUR-INTER | The contours between, at the interval you chose | DOGAMI lidar, USGS 3DEP |
| CONTOUR-TEXT | Contour elevation labels | DOGAMI lidar, USGS 3DEP |
| FROM A SITE PLAN | ||
| BLDG · PAVE · SITE-AREA | Buildings, paving and other areas you drew, or a layer name of your own | You |
| SKETCH-* | Paths, swales, grade breaks and fences or walls, each on its own layer | You |
| GRADE-PAD | The building pad at the elevation you set | You |
| GRADE-DAYLIGHT | Where the pad meets existing ground | Estimated from lidar ground |
| SETBACK | The buildable envelope from your setbacks | Setbacks you entered or confirmed from the code, not a city review |
| LOTLINE-OLD | Old lot lines inside adjoining lots merged into one site | County assessor |
| WHAT'S AROUND IT | ||
| UTIL-SEWER · STORM · WATER | Public mains, approximate and not a locate | The publishing utility, only where its terms allow a download: today Grants Pass, and Eugene's storm lines |
| TRANSMISSION | High-voltage lines with owner and voltage, approximate alignment | HIFLD |
| PLSS-TWP · SEC · DLC | Township, section and Donation Land Claim lines, labelled on PLSS-TEXT; reference only, not a survey | BLM CadNSDI |
| ODOT-HWY | State highway centerlines; no right-of-way width | ODOT |
| WATER-POD | Water-right points of diversion | OWRD |
| WELLS | Wells | OWRD |
| NOTES | The coordinate system, the lidar source, and every data source with its limits | ZoneNotice |
The subdivisions, annexations, site plans and building permits filed near your sites come with the same plan, with hearing dates: 79,000+ filings, building permits from 28 cities and counties and land-use filings statewide. Put an alert on a city, a county or one lot and hear when something is filed.
or $990 / year, 10 months for 12
1 seat included. + $49 / month or $490 / year for each extra seat, up to 20
or $1,990 / year, 10 months for 12
2 seats included. + $49 / month or $490 / year for each extra seat, up to 20
$99 covers one user and $199 covers two, for all of Oregon. Once you subscribe, add seats for your team at $49 a month or $490 a year each, up to 20. A seat added part-way through a billing period is charged for the days left, that day. Moving up to Pro starts once the payment goes through, and you pay only the difference for the days left in your period. Moving down to Standard happens at your next renewal, and you keep Pro until then. After the free trial, the plan renews automatically, at the price of your plan and seats, until you cancel. Cancel any time from your billing page, and you keep access to the end of the period you have paid for. No refunds.
Parcel outlines cover all 36 counties, from county assessors and regional governments. Union County's cover only the Upper Grande Ronde basin, and Grant County's date from 2016. Lidar, soils, flood, the survey grid and the other statewide layers work wherever their source has data.
Yes. Contours download as a DXF in Oregon State Plane North or South, in international feet as Oregon law specifies, with index and intermediate contours on their own layers. Site plans download as a layered DXF too. Contours also come as KML or KMZ for Google Earth.
No. It shows the public mains a utility publishes, approximately, so you know which utility to call. It is not a locate: call 811 and verify with the utility. Where no utility publishes its mains, the card says so rather than showing nothing.
Public sources: county assessors, the cities' and utilities' own map services, and state and federal agencies such as DOGAMI, OWRD, ODOT, BLM and NRCS. Every check names its source, so you can check it yourself. It is screening data: it does not replace a field survey or a geotechnical report.
Yes. Standard includes one person and Pro includes two. Once you subscribe, you can add seats from your Team page at $49 a month or $490 a year each, on either plan. On Standard, two people are $148 a month and three are $197; on Pro, three are $248. Up to 20 seats. Everyone gets their own sign-in, and site plans and projects can be shared to view or to edit. On Pro, every seat has its own monthly concept allowance. Need more than 20? Email support@zonenotice.com.
No. ZoneNotice is not affiliated with any city, county or state agency. It is a faster way to read what they already publish, and every record links back to its source.
Yes, from your billing page. Moving up to Pro starts once the payment goes through, and you pay only the difference for the days left in your current period. If you pay by bank account, the move happens at your next renewal, or you can add a card to move today. Moving down to Standard happens at your next renewal, and you keep Pro until then. Nothing is refunded. Concepts you have already applied to a site plan stay in the plan, and your concept results stay viewable for 30 days after Pro ends.
Any time, from your own billing page — two clicks, no email and no phone call. The trial takes no card, so there is nothing to cancel if you decide it is not for you. Once you do subscribe the plan renews automatically at the price of your plan and seats until you cancel, and cancelling leaves you with access to the end of the period you have already paid for. There are no refunds.
Bidding the work rather than designing it? The same plan finds contractors and suppliers new permits and land-use filings in the areas they work.
ZoneNotice for contractors